Compaction, Consolidation and Exploration

JKSSB Junior Engineer (Civil) · Soil Mechanics · 13 practice questions with answers and explanations: 10 Easy, 2 Medium, 1 Hard.

Sample questions

Sample Easy question 1

With an increase in the compaction effort, the maximum dry density:

  1. Decreases and the optimum moisture content increases
  2. Stays the same
  3. Increases and the optimum moisture content decreases
  4. Increases and the optimum moisture content increases
Show answer

Answer: C. More effort packs the grains closer with less water.

Sample Easy question 2

The zero air voids line on a compaction diagram shows:

  1. The dry density at full saturation for each water content
  2. The liquid limit
  3. The maximum dry density at each moisture content
  4. The optimum moisture content
Show answer

Answer: A. The compaction curve always lies below it.

Sample Easy question 3

Primary consolidation of a clay is the settlement due to:

  1. The compression of the soil particles
  2. The loss of air from the soil
  3. The creep of the soil skeleton
  4. The squeezing out of water from the pores
Show answer

Answer: D. Secondary consolidation is the later, slower creep.

Sample Medium question 4

The time factor Tv for 50% consolidation in Terzaghi's theory is about:

  1. 0.197
  2. 0.848
  3. 1.0
  4. 0.5
Show answer

Answer: A. For 90% consolidation, Tv = 0.848.

Sample Medium question 5

For a strip footing on a saturated clay with φ = 0 and c = 40 kPa, Terzaghi's ultimate bearing capacity with Nc = 5.7 is about:

  1. 40 kPa
  2. 228 kPa
  3. 114 kPa
  4. 456 kPa
Show answer

Answer: B. qu = c × Nc = 40 × 5.7 = 228 kPa (at surface level).

Sample Hard question 6

A clay layer 4 m thick has Cc = 0.3, e₀ = 0.9, an initial effective stress of 100 kPa and an increase of 100 kPa. The primary settlement is about:

  1. 0.63 m
  2. 0.19 m
  3. 0.38 m
  4. 0.1 m
Show answer

Answer: B. Sc = Cc H ÷ (1 + e₀) × log₁₀ ((σ₀ + Δσ) ÷ σ₀) = 0.632 × 0.301 = 0.19 m.

More Soil Mechanics topics for JKSSB Junior Engineer (Civil)