Sample Easy question 1

The purpose of lining an irrigation canal is to:

  1. Increase the seepage
  2. Increase the roughness
  3. Reduce seepage losses and control erosion
  4. Make the canal wider
Show answer

Answer: C. A lined canal also has a higher velocity and needs a smaller section.

Sample Easy question 2

A distributary head regulator is built to:

  1. Measure the silt
  2. Control the discharge entering a distributary from the parent canal
  3. Store the canal water
  4. Drain the field
Show answer

Answer: B. The canal escape is a different structure that releases surplus water.

Sample Easy question 3

A canal fall is provided when:

  1. The canal is lined
  2. The ground slope is steeper than the permissible bed slope of the canal
  3. The ground is flat
  4. The canal carries silt
Show answer

Answer: B. The fall drops the canal bed to keep the velocity within safe limits.

Sample Medium question 4

The silt factor of 0.25 mm silt is:

  1. 1.76
  2. 0.88
  3. 0.50
  4. 0.44
Show answer

Answer: B. f = 1.76 × √0.25 = 1.76 × 0.5 = 0.88.

Sample Medium question 5

A canal with a cross-section of 10 m² and a mean velocity of 0.8 m/s carries a discharge of:

  1. 0.08 cumec
  2. 12.5 cumec
  3. 8 cumec
  4. 80 cumec
Show answer

Answer: C. Q = A × V = 10 × 0.8 = 8 m³/s.

Sample Medium question 6

By Lacey's formula the wetted perimeter of a regime channel is P = 4.75 √Q. For Q = 25 cumec, P is:

  1. 25 m
  2. 118.75 m
  3. 47.5 m
  4. 23.75 m
Show answer

Answer: D. P = 4.75 × √25 = 4.75 × 5 = 23.75 m.

Sample Hard question 7

By Lacey's formula V = (Q f² ÷ 140)^(1/6), for Q = 140 cumec and a silt factor f = 1.0, the regime velocity is:

  1. 1.4 m/s
  2. 0.5 m/s
  3. 2.0 m/s
  4. 1 m/s
Show answer

Answer: D. V = (140 × 1 ÷ 140)^(1/6) = 1^(1/6) = 1 m/s.

Sample Hard question 8

By Kennedy's formula V₀ = 0.55 m D^0.64, with m = 1 and a depth of 2 m, the critical velocity is about:

  1. 2.0 m/s
  2. 1.10 m/s
  3. 0.55 m/s
  4. 0.86 m/s
Show answer

Answer: D. V₀ = 0.55 × 2^0.64 = 0.857 m/s.